Projects reference list of ESPACE Ltd.

Projects reference list of

ESPACE Ltd.

Baltika BREWERY

Baltika St Petersburg Upgrade of 8 CCT departments (approximately 100 tanks) without production downtime. Switch from Simatic S5 controllers to Simatic S7 controllers. Replacement of InTouch WonderWare visualization system by Proleit V7. Software replacement

Baltika St Petersburg Upgrade of 6 non-alcoholic beer lines from APV. Switch from Simatic S5 controllers to Simatic S7 controllers. Replacement of Braumat Siemens visualization system by Proleit V7. Controller’s software replacement. We found a solution for line restart after its shutdown. Equipment reinstallation, startup and commissioning.

Baltika St Petersburg (Vena) Engineering and delivery of automation system for pure yeast culture equipment (ALFA LAVAL). Integration of equipment to the visualization system FIX32 Intellution. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

Baltika St Petersburg engineering and delivery of automation system for kisielguhr (diatomit) dewatering on ALFA LAVAL decanter. Integration of equipment to the Proleit V7 system. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

Baltika Rostov-on-Don Engineering and delivery of CIP station for bottling department. Engineering and delivery of automation system Delivery of electrical cabinets, software engineering. Installation supervision, strat-up and commissioning (mechanical equipment supplied by ALFA LAVAL).

Baltika St Petersburg Multi-dosing system. System of apple cider pasteurization and storage. Engineering and delivery of automation system. Delivery of electrical cabinets, software engineering. Integration in visualization systems BrewMaxx V6 (Proleit), OTAS (GEA), BRAUMAT (SIEMENS). Installation supervision, strat-up and commissioning (mechanical equipment supplied by ALFA LAVAL).

Baltika St Petersburg Process engineering and delivery of sugar syrup cooking automation system. Equipment integration in Proleit V7 system. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

Baltika Rostov-on-Don Engineering and delivery of automation system (based on Proleit visualization system) for bright beer cellar based on ALFA LAVAL cluster system. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

Baltika Rostov-on-Don Software engineering for replacement of Simatic S5 controller to Simatic S7 for «Westfalia Separator» separator. Equipment reinstallation, start-up and commissioning.

Baltika Khabarovsk Engineering and delivery of automation system for kisielguhr (diatomit) dewatering on ALFA LAVAL decanter. Integration of equipment to the Proleit V7 system. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

Baltika Novosibirsk Engineering and delivery of automation system for blending department equipment and CIP station (ALFA LAVAL). Integration of equipment to the Proleit V7 system. Software engineering. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning

Baltika St Petersburg Engineering and delivery of automation system for upgrade of bright beer cellar cluster based on ALFA LAVAL cluster system. Integration into OTAS (GEA) visualization system. Switch from Simatic S5 controllers to Simatic S7 controllers. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical Installation. Strat-up and commissioning.

Baltika St Petersburg Engineering and delivery of automation system for upgrade of yeast collecting equipment from 9 CCT departments (supplied by ALFA LAVAL). Integration into Proleit V7 (Proleit), BRAUMAT (SIEMENS) visualization systems. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical Installation. Strat-up and commissioning.

Baltika St Petersburg Engineering and delivery of automation system for upgrade of yeast department for yeast washing and dealcoholization. Integration of equipment to the Proleit V7 visualization system. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical Installation. Strat-up and commissioning.

Baltika St Petersburg Upgrade of automation system for yeast department CIP station (yeast tanks, yeast collecting and yeast dosing lines. Total 120 object for cleaning). Integration in Proleit V8 (Proleit), Intouch WonderWare visualization systems Strat-up and commissioning without production interruption.

DEKA

JSC «DEKA». Phase 1 Engineering and delivery of automation system for kvass production equipment (ALFA LAVAL). Software engineering. Engineering, assembling and supplying of electrical cabinets. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

JSC «DEKA». Phase 2 Process engineering, engineering and delivery of automation system for equipment for expansion of kvass production. Sugar syrup department, department of kvass wort concentrate storage and dosing, fermentation department, kvass filtration department, bright beer cellar. Engineering, assembling and supplying of electrical cabinets. Engineering of software based on WinCC V6.0. visualization system. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

JSC «DEKA». Phase 2 Process engineering, engineering and delivery of automation system for equipment for kvass blending and carbonization. Engineering, assembling and supplying of electrical cabinets. Engineering of software based on WinCC V6.0. visualization system. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

JSC «DEKA» Engineering and delivery of automation system for water deaeration equipment ALDOX ALFA LAVAL. Engineering, assembling and supplying of electrical cabinets. Software engineering. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning. Integration into WinCC V6.0 visualization system.

JSC «DEKA» Process engineering, engineering and delivery of automation system for equipment for beer filtration, blending and carbonization based on combination filter “ORION”. Engineering, assembling and supplying of electrical cabinets. Engineering of software based on WinCC V6.0. visualization system. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

TOMSK BEER

OJSC «Tomsk beer» Engineering and delivery of automation system for equipment for beer filtration, blending and carbonization based on combination filter from ALFA LAVAL. Engineering, assembling and supplying of electrical cabinets. Engineering of software based on Proleit V6 visualization system. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

OJSC «Tomsk beer» Supervision of electrical and mechanical Installation of equipment for CCT and yeast departments.

OJSC «Tomsk beer» Engineering and delivery of automation system for ALFA LAVAL equipment for CIP station for kvass department. Engineering, assembling and supplying of electrical cabinets. Software engineering. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

OJSC «Tomsk beer» Engineering and delivery of automation system for ALFA LAVAL equipment for kvass membrane filtration. Engineering, assembling and supplying of electrical cabinets. Software engineering. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

OJSC «Tomsk beer» Engineering and delivery of automation system for upgrade of kvass department (based on ALFA LAVAL equipment). Engineering, assembling and supplying of electrical cabinets. Software engineering. Supervision of equipment electrical and mechanical Installation. Strat-up and commissioning.

SUN Interbrew

OJSC SUN INTERBREW, VOLZHSKY BRANCH Mechanical Installation supervision. Reconstruction of beer production.

OJSC SUN INTERBREW, PERM BRANCH Cold side equipment expansion, cluster panel in bright beer cellar, installation of yeast autolyzer. Equipment integration into visualization system WinCC V6.0. Software engineering. Electrical Installation supervision. Сommissioning and start-up.

OJSC SUN INTERBREW, PERM BRANCH CCT department equipment expansion; CIP station based on ALFA LAVAL equipment. Equipment integration into visualization system WinCC V6.0. Engineering, assembling and supplying of electrical cabinets. Software engineering based on visualization system WinCC V6.0. Mechanical and electrical Installation supervision. Сommissioning and start-up.

CARLSBERG

DERBES BREWERY, Almaty Software Engineering for CCT department, bright beer cellar and CIP station of fermentation department on request of ALFA LAVAL. Equipment integration into visualization system Proleit V7.1. Сommissioning and start-up.

DERBES BREWERY, Almaty Software Engineering for of yeast collecting equipment and interfacing it with Keraflux Schenk station upon request of ALFA LAVAL. Equipment integration into visualization system Proleit V7.1. Сommissioning and start-up.

DERBES BREWERY, Almaty Software Engineering for filtration line with PVPP Steinecker. Equipment integration into visualization system Proleit V7.1. Сommissioning and start-up.

CARLSBERG KAZAKHSTAN, Almaty Software Engineering for filtration line with PVPP KHS.Equipment integration into visualization system Proleit V7.1. Сommissioning and start-up.

CARLSBERG KAZAKHSTAN, Almaty Software Engineering for pure yeast culture department ALFA LAVAL. Equipment integration into visualization system Proleit V7.1. Сommissioning and start-up.

BUKET CHUVASHII

OJSC BUKET CHUVASHII, Cheboksary Software Engineering for Schenk filtration line. Supply of visualization equipment, client-server WinCC 7.0. Сommissioning and start-up.

OJSC BUKET CHUVASHII, Cheboksary Process engineering and choice of equipment for new CCT and yeast storage departments, CIP station for new fermentation department. Software Engineering. Engineering, assembling and supplying of electrical cabinets. Supply of visualization equipment, client-server WinCC 7.0. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BUKET CHUVASHII, Cheboksary Expansion of new CCT department (installation of 8 CCTs), yeast storage department (installation of 2 yeast storage tanks). Software Engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BUKET CHUVASHII, Cheboksary Software Engineering for new bright beer cellar based on cluster system supplied by Pentair. Adaptation and changing of pasteurizers’ software for automatiс performance with new bright beer cellar. Equipment integration in visualization system client-server WinCC 7.0. Сommissioning and start-up.

OJSC BUKET CHUVASHII, Cheboksary Software Engineering for Steinecker brewhouse. Adaptation and changing of malt department for automatic performance. Supply of visualization equipment, client-server WinCC 7.4. Сommissioning and start-up.

OJSC BUKET CHUVASHII, Cheboksary Replacement of PLC software and visualization system Botec Steinecker for current brewhouse with MERLIN brewing kettle with retention of technological characteristics. Replacement of Simatic S7-416 controller with S7-1500. Replacement of PLC equipment and computers which were causing problems in equipment performance. Supply of visualization equipment, client-server WinCC 7.4. Сommissioning and start-up.

BULGARPIVO

OJSC BULGARPIVO, Naberezhnye Chelny Software engineering for existing CIP station of bottling department. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BULGARPIVO, Naberezhnye Chelny Process engineering and choice of equipment for new CCT and yeast storage departments, CIP station for new fermentation department. Software Engineering. Engineering, assembling and supplying of electrical cabinets. Supply of visualization equipment, client-server WinCC 7.0. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BULGARPIVO, Naberezhnye Chelny Process engineering and choice of equipment for CIP station of bottling department. Software Engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BULGARPIVO, Naberezhnye Chelny Process engineering and choice of equipment for unit for fermentation start in CCT. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BULGARPIVO, Naberezhnye Chelny Process engineering and choice of equipment for CIP station of pure yeast culture department. Software engineering for CIP station and pure yeast culture department. Integration of equipment to the visualization system client-server WinCC 7.0. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

OJSC BULGARPIVO, Naberezhnye Chelny Process engineering and choice of equipment for new CCT and yeast storage departments and CIP station for new fermentation department. Software engineering. Engineering, assembling and supplying of electrical cabinets. Supply of visualization equipment client-server WinCC 7.0. Mechanical and electrical Installation supervision. Сommissioning and start-up.

RUGEN BREWERY

Rugen Brewery Ltd, Voronezh region Upgrade of existing czech brewhouse. Replacement of Allen Bradley equipment with Siemens equipment. Software engineering. Supply of visualization equipment client-server WINCC 7.0. Electrical Installation supervision. Сommissioning and start-up.

Rugen Brewery Ltd, Voronezh region Process engineering of a new brewhouse. Software engineering. Integration of equipment to the visualization system client-server WinCC 7.0. Electrical Installation supervision. Сommissioning and start-up.

Rugen Brewery Ltd, Voronezh region Process engineering of 1 external heating exchanger for 2 brewhouses. Software engineering. Integration of equipment to the visualization system client-server WinCC 7.0. Electrical Installation supervision. Сommissioning and start-up.

Rugen Brewery Ltd, Voronezh region Water treatment department. Software engineering. Integration of equipment to the visualization system client-server WinCC 7.0. Engineering, assembling and supplying of electrical cabinets. Electrical Installation supervision. Сommissioning and start-up.

Rugen Brewery Ltd, Voronezh region Wet mill VARIOMILL KRONESS. Software engineering. Integration of equipment to the visualization system client-server WinCC 7.0. Electrical Installation supervision. Сommissioning and start-up.

VASILEOSTOVSKAYA BREWERY

VASILEOSTROVSKAYA BREWERY, St Petersburg Process engineering and choice of equipment for CIP station of yeast and fermentation departments. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

VASILEOSTROVSKAYA BREWERY, St Petersburg Upgrade of existing czech brewhouse. Replacement of Allen Bradley equipment with Siemens equipment. Software engineering. Supply of visualization equipment client-server WINCC 7.0. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

VASILEOSTROVSKAYA BREWERY, St Petersburg Automation of manual brewhouse based on Siemens equipment. Software engineering. Integration in visualization system client-server WinCC 7.0. Mechanical and electrical Installation supervision. Mechanical and electrical Installation supervision. Сommissioning and start-up.

VASILEOSTROVSKAYA BREWERY, St Petersburg Replacement of brewhouse from Simatic S7-300 controllers to Simatic S7-1500. Upgrade of visualization system client-server WinCC 7.0 to WinCC 7.4. Сommissioning and start-up.

VASILEOSTROVSKAYA BREWERY, Kingisepp Supply of visualization equipment WinCC 7.4. Process engineering and choice of equipment for a new plant:

CCT department: Process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

YEAST DEPARTMENT: Process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

PURE YEAST CULTURE DEPARTMENT: Process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

BRIGHT BEER CELLAR: Process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

CIP STATION: process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

BREWHOUSE: Software engineering. Electrical Installation supervision. Сommissioning and start-up.

MILL: Wet mill by VARIOMILL KRONESS. Software engineering. Mechanical and electrical Installation supervision. Сommissioning and start-up.

PASTEURIZER: Process engineering and choice of equipment. Software engineering. Engineering, assembling and supplying of electrical cabinets. Mechanical and electrical Installation supervision. Сommissioning and start-up.

HEINIKEN BREWERY

HEINIKEN BREWERY, St Petersburg Deaerated water equipment ALDOX ALFA LAVAL. Mechanical and electrical Installation supervision. Сommissioning and start-up. Integration in visualization system InTouch WonderWare.

HEINIKEN BREWERY, St Petersburg Engineering and supply of automation system for ALFA ALVAL’s equipment for apple cider production and apple juice storage. Integration of equipment in Proleit V7 system for brewhouse, fermentation and filtration department. Engineering, assembling and supplying of electrical cabinets. Software engineering. Electrical Installation supervision. Сommissioning and start-up.

WIMM BILL DANN

OJSC WIMM BILL DANN, Baltiyskoe Moloko Upgrade of milk receipt units. Software engineering. Integration into visualization system InTouch WonderWare. Electrical Installation supervision. Сommissioning and start-up.

OJSC WIMM BILL DANN, Moscow Software engineering for ultra-pasteurization station on H+E Protec Gmbh request. Electrical Installation supervision. Integration into visualization system Proleit V8.0. Сommissioning and start-up.

CAMPINA

CAMPINA Ltd., Stupino, Moscow region Upgrade of the plant to increase production capacity on H+E Protec Gmbh request. Milk receipt department, raw milk storage, milk treatment department, standardized milk storage department, cream storage department, mixing unit, maturation department. Software engineering. Integration into visualization system InTouch WonderWare. Mechanical and electrical Installation supervision. Сommissioning and start-up.